|

Description
This private elementary K-6 school was an addition to the fastest growing church in the Midwest. Two rooms per grade level were provided on this two-story design which occurs on this sloping site. A centrally located full-sized gym provides an activity center for the children but also a great center for the adults to enjoy their “pick-up”
basketball games. Just off the connector corridor to the Church Building occurs the Cafeteria and Kitchen that serves both the Church and the School. Enrollment has been maintained at 350 children.
|
New Building for
CFFC
School
Milwaukee, WI1998
ClientCFFC Size14,000 Total S.F. ServicesDesign thru construction administration (limited). Design-Build Project. General ContractorCD Smith Construction
|
|