|
^ Click images to view larger

DescriptionIt was the desire of the CFFC organization to provide educational needs to teens and young adults that had challenges with traditional education system. Thus the Destiny Youth Plaza was developed at the strip-shopping center at the corner of Good Hope Road & 76th streets in Milwaukee. This center was remodeled into Classroom Area, Gathering Area, Gaming Area, Cafeteria, and Roller Skating Area’s. A full size Gym was an addition to the Northwest corner of the building. The programming of the Plaza is technical training and basic education for youth ages 13 to 18. Enrolment capacities have been 350 to 400 students.
|
Building Remodeling for
Destiny Youth Plaza
High School
Milwaukee, WI2003
ClientCFFC Size74,375 S.F. ServicesDesign through construction administration (limited). Design Build project. General ContractorCD Smith Construction
|
|